The ability to pause requirements being available through a bulk edit, or linked to the code groupings
It would be extremely useful to have the ability to pause requirements being available through a bulk edit, or linked to the code grouping.
We have an external linen provider for a location that is going to be away for a period of time, and the only way to mark the requirements as unavailable for that period was to update the validation settings in all 300 requirements.
The requirements needs to have a bulk update option where multiple requirements can be select, or that the update can be made to groups of requirements (where connected by the code that groups them together).
This is really important for our business, and I can imagine that other users of RMS have instances where requirements (hampers, breakfast, tours etc) are not available and should not be sold during a period of time (unavailability, seasonality etc)